Home
Zermatt (Summer)

BuiltWithNOF
Bridge

325-P1020229-CLS

Bridge

After a few miles I had the option of continuing to follow the trail that basically runs parallel with the railway line to Tasch, or to cross the valley (using this bridge) to take a trail that runs diagonally up the East side of the valley before descending into Tasch. The latter option sounded slightly more interesting and challenging, so I decided to do that.

[Home] [Zermatt Summer 2013 Gallery]